EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
I-CAVS
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (844)
Research
Workshop
- (13)
Fuselage
- (381)
Firewall
- (21)
Tail Feathers
- (167)
Wings
- (87)
Controls
- (21)
Avionics
- (11)
Electrical Syst.
- (3)
Instrument Panel
- (4)
Landing Gear
- (16)
Engine
- (20)
Propeller
- (2)
Fuel System
- (9)
Interior Finish
- (17)
Paint / Decals
- (1)
Inspection
Tools
- (3)
Auto Entry
SB & Letters
- (14)
-
CHK Garmin 23038 Rev...
-
CHK VANS SL-00003...
-
NA VANS SB 00080...
-
CHK VANS SB-00043...
-
CHK VANS SB-00036...
-
VANS SB-00007...
-
CHK VAN SB-19-09-09...
-
VANS SB-18-03-30...
-
VANS SB-14-8-28...
-
VANS SB-000002...
-
38-3 Beringer Brake...
-
Garmin GSA 28Garmin...
-
Laser Cut Parts...
-
SB-00007 New Landing...
Equipments
- (2)
Brake System
- (31)
Doors
- (21)
Builder Name:
paolo cavosi
-
Project:
Vans - RV-10
Total Hours:
2429.2
Total Flight Time:
Start/Last Date:
May 28, 2019 - No Finish Date
Engine:
IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:
MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:
Garmin G3X
Friendly URL:
https://eaabuilderslog.org?s=I-CAVS
Home or Last Project Picture
Dec 17, 2023
VANS SB-18-03-30 Elevator Stop Horn
- (1 hour)
Category: SB & Letters
Elevator horn has been checked and trimmed to avoid blockage with the elevator stop. Checks done during the empennage / Tailcone assembly.
sb 18-03-30.pdf
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.